HCM SUMMIT
23 October 2025
Tickets available soon
Leisure Opportunities
Job search
Job Search
see all jobs
Latest job opportunities
Everyone Active
Competitive
Cleveland
star job
Doncaster Culture and Leisure Trust
£47,000 - £50,000pa + pension + generous benefits package
Doncaster, South Yorkshire

Kengo Kuma hits back in Tokyo 2020 stadium row

Job opportunities
Doncaster Culture and Leisure Trust
£47,000 - £50,000pa + pension + generous benefits package
location: Doncaster, South Yorkshire, United Kingdom
more jobs

The architect developing Japan’s National Stadium for the Tokyo 2020 Olympic Games has publicly refuted claims his studio have copied from an earlier design submitted by Zaha Hadid Architects (ZHA).

According to the Japan Times newspaper, Kengo Kuma spoke at a news conference on 15 January in Tokyo to deny that significant similarities exist between the two designs for the stadium.

“I believe if you take a look at Zaha Hadid’s design and mine, you can see very different impressions of the building,” he is reported to have said.

ZHA – who are embroiled in a row with the Japan Sports Council (JSC) over its decision to drop them from the stadium project – have said that “remarkable similarities” exist between the stadium layout and seating bowl they proposed, and the one created by Kuma.

Yesterday (14 January) ZHA submitted a report to the JSC outlining these claims in detail. In a statement, the firm said the document “will form the basis for the discussions we hope to resume shortly with the JSC to resolve the important issue of the use of valuable design work that is currently the copyright of ZHA and the original design team.”

The studio also said it has received and rejected a written request from the JSC to hand over copyright for the design and sign a non-disclosure agreement in order to receive an overdue payment for its work on the project.

At the press conference, Kuma reportedly said similarities in design are inevitable when trying to create a seating configuration that can give 80,000 spectators a clear view. He added that his stadium is lower and flatter than ZHA’s design and uses different natural materials in a bit to minimise construction costs and integrate the stadium with its surroundings in the leafy Jingu Gaien area.

He also denied suggestions that ZHA were dropped from the project because they are a foreign studio. According to the Japan Times he added that “it is perhaps difficult for architects from other countries to work in Japan” due to the language barrier and the way in which meetings are conducted.

While the ¥149bn (£806m, US$1.2bn, €1.1bn) National Stadium is on course to be completed by November 2019, the row over its development threatens to overshadow the project.

Sign up for FREE ezines & magazines
The architect developing Japan’s National Stadium for the Tokyo 2020 Olympic Games has publicly refuted claims his studio have copied from an earlier design submitted by Zaha Hadid Architects.
SAR,ARC,DES,DEV,CLD
THUMB820159_125346.jpg

More News

1 - 15 of 68,410
26 Feb 2025
Improvements in life expectancy in Europe have slowed according to a study published in The Lancet Public Health Journal, with England showing the largest deceleration. ... More
26 Feb 2025
US operator, Life Time, has started the rollout of cold plunges to more than 70 of its clubs in response to customer demand. In a ... More
25 Feb 2025
Peloton has entered into a partnership with the University of Texas to offer the first immersive Peloton workout space on a college campus. The university’s ... More
24 Feb 2025
Corinthia Hotels and Dubai General Properties (DGP) have partnered to develop a new five-star hotel and residential complex in the heart of Dubai, marking Corinthia's ... More
24 Feb 2025
Technogym founder, Nerio Alessandri, has unveiled his trademarked 'Healthness' concept at the Technogym 25th Wellness Congress. The new word joins the company's lexicon which includes ... More
20 Feb 2025
BIG – Bjarke Ingels Group has completed the 1,200sq m Jinji Lake Pavilion in Suzhou, China. Situated on the Jinji waterfront, the pavilion offers a ... More
19 Feb 2025
Four Seasons has announced plans to expand its presence in the UAE with a new luxury resort in Ras Al Khaimah, set within the flagship ... More
19 Feb 2025
Glasgow Clyde College (GCC) is introducing an innovative UK degree-level qualification: the Advanced Leadership in the Spa and Beauty Industry course. This new programme, available ... More
18 Feb 2025
Accor has released a comprehensive white paper designed to deepen understanding of wellness design and its capacity to enhance guest experiences, boost loyalty and drive ... More
18 Feb 2025
After four launches last year, Third Space is keeping up the pace of expansion with a new signing on London’s Oxford Street, as well as ... More
18 Feb 2025
Young and affluent consumers are leading health club usage in Latin America, according to research from the Health and Fitness Association (HFA) and there are ... More
17 Feb 2025
Colruyt Group’s fitness chain, Jims, is doubling its estate with the acquisition of 40 fitness clubs from NRG. The deal will accelerate the Colruyt Group’s ... More
17 Feb 2025
Global Wellness Day (GWD) is set to return for its 14th year on 14 June 2025, embracing the theme: #ReconnectMagenta – a call to restore ... More
17 Feb 2025
Merlin Entertainments has confirmed Fiona Eastwood as its CEO – she had been interim CEO following the departure of Scott O’Neil. Eastwood said: “I have ... More
14 Feb 2025
Mike Farrar is stepping down as chair of UK Active, after being appointed interim Permanent Secretary of the Department of Health in Northern Ireland. Farrar ... More
1 - 15 of 68,410