Early bird
tickets
available now!
The Leisure Media Company Ltd
The Leisure Media Company Ltd
The Leisure Media Company Ltd
Leisure Opportunities
Job search
Job Search
see all jobs
Latest job opportunities
Everyone Active
Competitive rates of pay
South Oxhey Leisure Centre, Watford
star job
Fife Sports and Leisure Trust Ltd
£56,107.80 - £63,165.86pa + benefits
Dunfermline, Scotland
East Devon District Council
£41,418 - £48,474pa + local govt pension + benefits
Honiton, Devon
London South Bank University
£31,396 to £34,557, inclusive of £4,952 London Weighting
Southwark Campus
Bolton Arena
£Competitive + pension + benefits
Bolton, Greater Manchester

How did AECOM design the 2017 Serpentine Pavilion? The firm reveal all to CLAD

Job opportunities
London South Bank University
£31,396 to £34,557, inclusive of £4,952 London Weighting
location: Southwark Campus, United Kingdom
East Devon District Council
£41,418 - £48,474pa + local govt pension + benefits
location: Honiton, Devon, United Kingdom
Bolton Arena
£Competitive + pension + benefits
location: Bolton, Greater Manchester, United Kingdom
more jobs

Three of AECOM’s leading engineers have told CLADglobal how they used advanced in digital technology to complete this year’s Serpentine Pavilion in London.

Director Jon Leach, associate director Amy Koerbel and principal engineer Michael Orr explained how virtual and augmented reality software allowed architect Diébédo Francis Kéré to virtually walk around his full-scale structure in the earliest stages of the design process, helping his team and AECOM to translate his vision for a tree-like gathering space into a reality.

In an extensive interview that can be read in full below, the trio added that while digital design technology is still held back by the cost of hardware, the quality of internet connectivity and the sometimes incompatible ways different softwates are developed, it is reaching the stage where architects who use it can “design more elegant buildings in a more efficient way” in closer alignment with their clients.

AECOM have built the last five pavilions in the Serpentine series. At the press launch for Kéré’s structure last week, the architect described them as “the best engineers in the world.”

What tools and technologies did you use to realise Francis Kéré’s vision for the Serpentine Pavilion?

We used a lot of digital technology throughout the design process alongside more traditional hand sketching and small-scale physical models. Initially geometry was shared between Kere Architecture and AECOM in the form of three dimensional (3D) Rhino models, which AECOM were able to rationalise and rebuild in a parametric way using the visual scripting plug-in to Rhino, Grasshopper, tweaking the script to suit updates to design details as they were agreed.

Using in-house tools developed and refined over a number of years, we were able to output the geometry from Rhino to our chosen analysis software SCIA Engineer, where the design was completed and the results fed back into the parametric script.

Our work on the 2016 Pavilion and Summer Houses established work flows that enabled us to take 3D geometry from a Rhino model into a full immersive virtual reality (VR) environment using the HTC Vive and into an augmented reality (AR) environment using the Microsoft HoloLens. The streamlined workflows allowed us to place the architect inside an early version of his Pavilion as early as January this year, enabling Francis to virtually walk around his full-scale structure pointing out tweaks and changes required to the design to the team following him around via a computer screen.

The HoloLens headsets are fully portable, which allowed us to carry them with us to meetings at the contractor’s offices where they were used to illustrate complex and tricky details in full scale to the both the CAD modeller, fabrication team and the person who was physically going to build it, increasing understanding and crucially reducing time as the detail could be viewed from any angle with any problems rectified quickly.

How closely did you work with Kéré Architecture throughout the process?

The design team worked from one digital model, which AECOM retained ownership of. The engineers and architects were in daily conversation throughout the process, sharing ideas mainly through sketching and markups on the model itself. The overall geometry was fixed at the end of January, which allowed time for the planning application and details for the secondary cladding elements to be worked out. During visits to London from their base in Berlin, the architects would view the latest updates to the model in either the HTC Vive or the HoloLens, pointing out clashes in the model and any geometry that needed changing.

Are there limitations to the digital technology?

When producing such bespoke designs the use of computational models can only prove so much, and the use of physical mock-ups and testing is essential. Full-scale mock-ups of sections of the roof, walls and connections were all built at [fabrication firm] Stage One's facility in York to test a combination of appearance, durability, weather-tightness, strength and fire resistance. The results of the tests were then fed back into the design.

What do you enjoy about the challenge of working on the Serpentine Pavilions?

The timescales for the project are famously challenging, with just 20 weeks from inception to completion. This is deliberate as it leads to a spontaneity in the design; a fusion of art, architecture and engineering.

For an engineer what is most enjoyable and makes the experience unique is the true synergy between all parties, from the Serpentine Galleries to the architects, engineers and construction team. It necessitates a blurring of traditional consultant responsibilities and interfaces as everybody pulls together to realise the architectural vision. We get involved in all aspects of the design from the structural analysis to all of the connections, fixings, material selection and colour; even the type of gravel was selected to have visual properties but also to assist with the drainage. With almost every part of the structure visible we have to ensure that the aesthetic quality is of the highest standard.

There is also a strong management piece to the role, working with the architect and the wider team to ensure all technical, statutory and budget constraints are met through a continuous iteration of design. This has to be a pro-active role to keep the project moving, and buying into the vision is vitally important so we all have a common understanding of what is important to the design

Every year brings new challenges for the team, from sourcing new materials to coming up with new methods of fabrication and dealing with the great British summertime weather. Each architect works in a different way, and this year collaborating with and supporting Francis and his team has been an absolute pleasure. It has felt like a true team effort; everybody bought into his vision from the outset and I believe the end product is a strong testament to that.

What are the implications of advancing digital technology for the design and construction industries?

The use of digital technology is becoming more and more the norm in the industry with BIM Level 2 a mandate for most new projects that are established. The digital technologies outlined previously (Parametric Design, Computational Design, AR & VR) can complement this level of detail and assist the design team in making design decisions. What is lacking in the industry is the ability to have these different tools work together seamlessly due to the different ways in which they are built. At AECOM, we have developed our own tools to help bridge this gap and reduce the time is takes to move models from one source to another however they require constant updating as technologies develop.

If used appropriately, digital technologies allow us to design more elegant buildings in a more efficient way, allowing new ways of seeing designs develop both at a micro (viewing a steel connection detail) and macro (looking at the building in context of the site it is going into) scale and communicate them in a way that the intent is fully understood by all members of the design team, from client to end user.

Sign up for FREE ezines & magazines
Three of AECOM’s leading engineers have told CLAD how they used advanced in digital technology to complete this year’s Serpentine Pavilion in London.
CLD,ARC,DES,PHR,TEC
THUMB19959_911050.jpg

More News

1 - 15 of 68,042
22 Jul 2024
US health and fitness giant, Planet Fitness, which flagged plans to launch in Spain back in February, has officially announced the opening of its first ... More
22 Jul 2024
Plans have been unveiled for La Maviglia, a new luxury resort and expansive medi-spa set to open in Italy's Puglia region, renowned for its Primitivo ... More
19 Jul 2024
Auberge Resorts Collection will launch its first UK property and destination spa in Mayfair, London, in 2025, following a deal with UK-based global private investment ... More
19 Jul 2024
Urban Gym Group CEO Neil Randall talks in this month’s HCM about how being passed over for promotion taught him the resilience to power through ... More
19 Jul 2024
A large new mineral springs destination has launched in Texas, inspired by some of the world’s most famous hot springs – such as Jordan’s Dead ... More
18 Jul 2024
Boxing and strength franchise UBX has taken a step closer to realising its ambitions to be the largest boxing provider in the Middle East by ... More
Life Fitness (UK) Ltd
Life Fitness (UK) Ltd
18 Jul 2024
Fitness International has announced the acquisition of XSport Fitness, adding to its portfolio of brands, which includes LA Fitness, Esporta Fitness, City Sports Club and ... More
18 Jul 2024
A thought-provoking, US national probability study, The WELLSurvey™, has revealed that the majority of Americans now include several health and wellness practices in their everyday ... More
17 Jul 2024
Community Leisure UK (CLUK) and The Richmond Group of Charities have joined forces to support charitable trusts and social enterprises in strengthening their programmes for ... More
18 Jul 2024
US integrative wellness brand The Well has named Ariella Willoughby as its new VP of operations, aiming to drive significant growth and operational success across ... More
17 Jul 2024
Mental Health Swims has been awarded almost £18,000 of lottery money to extend its mission to support mental health through swimming. The community organisation was ... More
16 Jul 2024
Employee wellness app GoJoe has teamed up with Les Mills for a major new content offering, giving access to hundreds of new workouts. The partnership ... More
16 Jul 2024
Former footballer, David Beckham, has become a strategic investor in health sciences company, Prenetics, which pioneers scientific advancements in health. The partners have co-founded a ... More
16 Jul 2024
Middleton Enterprises, a UK-based family investment office, has committed £1.6 million (US$2.1 million, €1.9 million) in funding to the Light Centre – a network of ... More
16 Jul 2024
Gymbox has partnered with Haringey Council and not-for-profit organisation, Raza Sana, to give opportunities to those living in disadvantaged communities. Yesterday (15 July) saw the ... More
1 - 15 of 68,042
The Leisure Media Company Ltd
The Leisure Media Company Ltd